Sample design · This website is a demo, made to show what your business site could look like. The company, people and reviews on it are not real. · This website is a demo. The business is not real.

Built by Prebuiltwebmarket.com

Free tool

Content mix planner.

Decide how often you post and in which formats. The planner lays out four weeks, rotates your pillars and adds up the production time, so you can see if the plan is realistic.

6

Every piece you publish, stories included. Two to fourteen.

Format mix

Drag to set the balance. Shares always add up to 100%.

42%
25%
25%
8%
Content pillars

Posts rotate through the pillars you tick.

24pieces in four weeks
52 hproduction time
7.4production days at 7 hours

Your four-week calendar

  • VShort-form video
  • CCarousels
  • SStories
  • PStatic posts
W1
VVideo
CCarousel
SStory
VVideo
PStatic
VVideo
No post
W2
CCarousel
SStory
VVideo
CCarousel
SStory
VVideo
No post
W3
VVideo
CCarousel
SStory
VVideo
PStatic
VVideo
No post
W4
CCarousel
SStory
VVideo
CCarousel
SStory
VVideo
No post

Mix by format

24pieces
Pieces and production hours by format
FormatPiecesShareHours eachHours
Short-form video1042%3.5 h35 h
Carousels625%2 h12 h
Stories625%0.5 h3 h
Static posts28%1 h2 h
Four weeks24100%52 h

Estimates only. Hours per piece are sample planning assumptions (concept, shoot share, edit and review): short-form video 3.5 h, carousel 2 h, static post 1 h, story 0.5 h. Your real numbers depend on the team and the format.

The assumptions

What the planner takes for granted.

A month
Four weeks. Pieces per month = posts per week × 4.
Short-form video
3.5 h per piece, sample figure covering concept, shoot share, edit and review.
Carousels
2 h per piece, sample figure covering concept, shoot share, edit and review.
Stories
0.5 h per piece, sample figure covering concept, shoot share, edit and review.
Static posts
1 h per piece, sample figure covering concept, shoot share, edit and review.
Production day
7 working hours. Production days = total hours ÷ 7.
Worked example
6 posts a week is 24 pieces. A 40/25/25/10 mix gives 10 videos, 6 carousels, 6 stories and 2 statics: 35 + 12 + 3 + 2 = 52 hours, or 7.4 production days.

Questions

About the planner.

Read: pillars that survive week three

Posts per week are spread across the days in a fixed order: Monday, Wednesday and Friday first, then Tuesday and Thursday, then the weekend. Above seven a week, some days carry two pieces.

The planner multiplies the monthly total by each share, rounds down, then gives the leftover pieces to the formats with the largest remainders. The counts always add up to the total.

They are sample assumptions for this demo: concept, a share of shoot time, edit and review per piece. A team with a batch shoot day will be faster, a solo creator slower.

The job a post does for the viewer: teach, show the making, prove it works, make an offer. The planner rotates through the pillars you tick so the same job never appears twice in a row.

Not from this demo. Switch to the table for the numbers, or screenshot the calendar. Nothing you enter is stored.

More hours than you have?

One shoot day a month can cover most of that calendar. Tell us the plan and we will tell you what it takes.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.